Paving continues on US 180 from Flagstaff to Snow Bowl next week

640-sfp-141207-20FLAGSTAFF — The Arizona Department of Transportation is returning next week to continue application of the top layer of asphalt along a five-mile segment of US 180 from Schultz Pass to Bader roads (mileposts 219 – 224).

Due to expected rain and unseasonably cooler temperatures, the paving work had to be halted for the remainder of this week. Warmer weather is forecasted to move into Flagstaff next week which will allow paving to resume.

The finishing paving work will occur daily, Monday, June 8 through Friday, June 12, between 6 a.m. and 6 p.m.

During paving operations, the two-lane roadway will be reduced to one lane. Pilot cars will allow for alternating travel and delays can be expected in both directions.

Motorists interested in traveling to the Grand Canyon National Park can use Interstate 40 to State Route 64 west of Flagstaff in Williams as an alternate route.

According to Flagscanner, other street repairs in Flagstaff from June 8 to 12 include:

  1. Aztec St. – Beal Rd. to Thorpe St.
  2. Beal Rd. – Rockridge Rd. to W End
  3. Lava Ln. – Rockridge Rd. to End
  4. Basalt Ln. – Rockridge Rd. to End
  5. Whipple Rd. – Navajo Rd. to Fort Valley Rd.
  6. Whiting Rd. – Navajo Rd. to Fort Valley Rd.
  7. Anderson Dr. – Aztec St. to Navajo Dr.
  8. Fort Valley Frontage Rd. – Fort Valley Rd to Murray Rd.
  9. Hazel Way – Talkington Dr. to End
  10. Davis Dr. – Talkington Dr. to End
  11. Talkington Dr. – Meade Ln. to Crescent Dr.
  12. Lantern Ln. – Talkington Dr. to End
  13. Meteor Dr. – Crescent Dr. to Crescent Dr.
  14. Kramer St. – End to End
  15. Foothills Way – Fremont Blvd. to End
  16. Eddy Dr. – Wilson Dr. to West End of Cul De Sac
  17. Shannon Dr. – Prescott Rd. to Wilson Dr.
  18. Wilson Dr. – Shannon Dr. to Fremont Blvd.
  19. Nicole Ln. – Peakview St. to End
  20. Red Rock Ln. – Snowcap Way to Peakview St.
  21. Sheila Dr. – Brenda Loop to Fremont Blvd.
  22. Mountain Dr. – Peakview St. to Fremont Blvd.
  23. Lois Ln. – Peak View to End
  24. Peakview St.– Ft. Valley Rd. to Shannon Dr.
  25. Kendrick St. – Mikes Pike St. to Butler Ave.
  26. Mikes Pike St. – Route 66 to Phoenix Ave.
  27. Leroux St. – Cottage Ave. to Phoenix Ave.
  28. Dupont Ave. – Verde St. to Agassiz St.
  29. Verde St. – Franklin Ave. to End

Detours are expected for the above street repairs.