Interstate 40 ramp restrictions at A-1 Mountain this week

FLAGSTAFF – Northern Arizona drivers accessing exit at A-1 Mountain (milepost 191) from Interstate 40 will need an alternate route during the following closures scheduled because of guardrail work. The Arizona Department of Transportation advises drivers to allow extra travel time as the nearest interchange—at Bellemont—is 5 miles to the west.

The A-1 Mountain off-ramp from westbound I-40 will be closed from 4:30 a.m. to 6:30 p.m. Monday, Oct. 30.
The A-1 Mountain on-ramp to westbound I-40 will be closed from 6:30 a.m. to 6:30 p.m. Tuesday, Oct. 31.
The A-1 Mountain off-ramp from eastbound I-40 will be closed from 4:30 a.m. to 6 p.m. both Wednesday, Nov. 1 and Thursday, Nov. 2.

Detour signs will be in place to direct drivers westbound I-40 to Bellemont (milepost 185) and turn around at the Bellemont traffic interchange to access eastbound I-40.

Schedules are subject to change based on weather and other unforeseen factors. For more information, please call the ADOT Project Information Line at 855.712.8530 or email Projects@azdot.gov. For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.

Westbound Interstate 40 off-ramps at A-1 Mountain restricted early Wednesday

FLAGSTAFF – Northern Arizona drivers exiting westbound I-40 at A-1 Mountain (milepost 191) will need an alternate route during early hours on Wednesday because of guardrail work. The Arizona Department of Transportation advises drivers to allow extra travel time as the nearest interchange–‒at Bellemont–‒is 5 miles to the west.

The A-1 Mountain off-ramp to westbound I-40 will be closed from 4:30 a.m. to 10 a.m. on Wednesday, Oct. 25. Drivers will use westbound I-40 to Bellemont (milepost 185) and turn around at the Bellemont traffic interchange to access eastbound I-40.

Schedules are subject to change based on weather and other unforeseen factors. For more information, please call the ADOT Project Information Line at 855.712.8530 or email Projects@azdot.gov. For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.

No access to eastbound Interstate 40 from A-1 Mountain early Friday

BELLEMONT – Northern Arizona drivers who access eastbound I-40 at A-1 Mountain (milepost 191) will need an alternate route during early hours on Friday because of resurfacing. The Arizona Department of Transportation advises drivers to allow extra travel time as the nearest interchange–at Bellemont—is five miles to the west.

The A-1 Mountain on-and off-ramps to eastbound I-40 will be closed from 4:30 a.m. to noon on Friday, Oct. 20. Drivers will use westbound I-40 to Bellemont (milepost 185) and turn around at the Bellemont traffic interchange to access eastbound I-40.

Paving on Interstate 40 ramps at Bellemont next week

BELLEMONT – The Arizona Department of Transportation is scheduled to pave at the Bellemont traffic interchange (Exit 185) next week as part of the improvement project on Interstate 40 from Parks to Riordan. The ramps will be closed during paving, however, access across the bridge will be accommodated at all times.

ADOT advises drivers to plan for extra travel time while work occurs and watch for the following ramp closures:

· WESTBOUND on- and off-ramps: Wednesday, Oct. 11, from 6 a.m. to 6 p.m.
· EASTBOUND off-ramp: Thursday, Oct. 12, from 6 a.m. to 6 p.m.
· EASTBOUND on-ramp: Friday, Oct. 13, from 6 a.m. to 6 p.m.

Motorists can use the interchanges at Parks (milepost 178) and A-1 Mountain (milepost 190) during the scheduled closures. Signs will be in place to assist with detour routes in the area.

Drivers should use caution and watch for construction personnel and equipment. For more information on the project, please visit the website at: azdot.gov/I40Paving.

Interstate 40 eastbound ramp closure in Williams begins Tomorrow

The Arizona Department of Transportation has scheduled daytime weekday closures of the I-40 eastbound off-ramp at Exit 161 in Williams beginning Tuesday, October 3. The required closures will increase productivity for the I-40 Devil Dog to Williams paving underway. The ramp restriction will be in effect weekdays from 6 a.m. to 6 p.m. until Friday, October 13.

Detour signage will be in the area, and drivers can find alternative access via the off-ramp at Exit 163, located two miles east of the required closure. Please use caution and watch for construction personnel and equipment in the construction zone.

Schedules are subject to change based on weather and other unforeseen factors. For more information, please call Coralie Cole, ADOT community relations project manager, at 602.501.4899 or ccole@azdot.gov. For real-time highway conditions statewide, visit the ADOT Traveler Information site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.

Paving on Interstate 40 westbound ramps at A-1 Mountain traffic this Wednesday and Friday

FLAGSTAFF – The Arizona Department of Transportation is scheduled to pave at the westbound ramps at A-1 Mountain traffic interchange as part of the improvement project on Interstate 40 from Parks to Riordan.

ADOT advises drivers to allow extra travel time while work occurs on the westbound ramps at A-1 Mountain traffic interchange (Exit 190) as follows:

· Wednesday, Sept. 27, from 5 a.m. to 6 p.m.
· Friday, Sept. 29, from 5 a.m. to 6 p.m.

Motorists can use the interchanges at Bellemont (milepost 185) and Flagstaff Ranch Road (milepost 192) for alternative travel. Signs will be in place to assist with detour routes in the area.

For more information about this project, visit azdot.gov/I40Paving.

Drivers should use caution and watch for construction personnel and equipment.

Work at Interstate 40 and Bellemont traffic interchange continues this week

BELLEMONT – The Arizona Department of Transportation is scheduled to continue paving at the Bellemont traffic interchange next week as part of the improvement project on Interstate 40 from Parks to Riordan.

ADOT advises drivers to allow extra travel time while work occurs on the eastbound ramps (Exit 185) as follows:

· Tuesday, Sept. 26, from 6 a.m. to 3 p.m.
· Thursday, Sept. 28, from noon to 6 p.m.
· Friday, Sept. 29, from 4:30 a.m. to noon.

Motorists can use the interchanges at Parks (milepost 178) and A-1 Mountain (milepost 190) to travel between eastbound I-40 and Bellemont. Signs will mark the detour routes. The Bellemont bridge over I-40 will remain open at all times, and no restrictions are scheduled on the westbound I-40 ramps.

For more information about this project, visit azdot.gov/I40Paving.

Drivers should use caution and watch for construction personnel and equipment.

Schedules are subject to change based on weather and other unforeseen factors. For more information, please call Coralie Cole, ADOT community relations project manager, at 602.501.4899 or ccole@azdot.gov. For real-time highway conditions statewide, visit the ADOT Traveler Information site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.

Interstate 40 eastbound ramp work at Bellemont begins tomorrow

BELLEMONT – The Arizona Department of Transportation is ahead of schedule for ramp repairs at the Bellemont traffic interchange and will begin reconstructing the eastbound Interstate 40 on- and off ramps at Exit 185 early Tuesday, Aug. 22.

Work on the westbound ramps is anticipated to be completed early Tuesday morning, and the ramps will be reopened for travel at 7 a.m. Once the westbound ramps are open, the eastbound on- and off-ramps at Bellemont will be closed for construction from 7 a.m. Tuesday, Aug. 22, to 6 p.m. Thursday, Aug. 31. The Bellemont bridge over I-40 will remain open at all times.

Motorists can use the interchanges at Parks (milepost 178) and A-1 Mountain (milepost 190) to travel between eastbound I-40 and Bellemont. Signs will mark the detour routes.

Ramp repairs are anticipated to be completed in time for the Labor Day weekend with no restrictions to the Bellemont area.

The ramp reconstruction is part of a larger project underway between Parks and Riordan that includes paving, new guardrail and minor bridge repairs at the Parks, Bellemont and A-1 Mountain traffic interchanges. Please visit the project website for more information at: azdot.gov/I40Paving.

Drivers should use caution and watch for personnel and equipment while construction is underway. Please allow for extra time for travel.

Schedules are subject to change based on weather and other unforeseen factors. For more information, please call Coralie Cole, ADOT senior community relations officer, at 602.501.4899 or ccole@azdot.gov. For real-time highway conditions statewide, visit the ADOT Traveler Information site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.

Interstate 40 westbound ramp work at Bellemont begins Monday

BELLEMONT – The Arizona Department of Transportation will begin reconstructing the westbound Interstate 40 on- and off-ramps at Bellemont (exit 185) early Monday, August 14.

To accommodate this work, the westbound on- and off-ramps at Bellemont will be closed from 5 a.m. Monday, August 14 to 6 p.m. Friday, August 25. The Bellemont bridge over I-40 will remain open at all times.

Motorists can use interchanges at Parks (milepost 178) and A-1 Mountain (milepost 190) to travel between westbound I-40 and Bellemont. Signs will mark the detour routes.

After work ends on the westbound ramps at Bellemont, crews will begin reconstructing the interchange’s eastbound on- and off-ramps.

The ramp reconstruction is part of a larger project underway between Parks to Riordan that includes paving, new guardrail and minor bridge repairs at the Parks, Bellemont and A-1 Mountain traffic interchanges. Please visit the project website for more information at: azdot.gov/I40Paving.

Drivers should use caution and watch for personnel and equipment while construction is underway. Please allow for extra time for travel.

Schedules are subject to change based on weather and other unforeseen factors. For more information, please call Coralie Cole, ADOT senior community relations officer, at 602.501.4899 or ccole@azdot.gov. For real-time highway conditions statewide, visit the ADOT Traveler Information site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.

Paving scheduled on Interstate 40 near Interstate 17 junction next week

FLAGSTAFF – Motorists traveling eastbound on Interstate 40 to Flagstaff should allow extra time while paving continues near the I-17 junction. Paving is scheduled from 2 a.m. to noon both Tuesday, August 8, and Wednesday, August 9. A single-lane restriction will be in place to accommodate work between mileposts 195 and 197, located one mile west of Butler Avenue.

Drivers should use caution and watch for construction personnel and equipment while paving is underway.

Schedules are subject to change based on weather and other unforeseen factors. For more information, call the ADOT Project Information Line at 855.712.8530 or email Projects@azdot.gov. For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.