PHOENIX – The Arizona Department of Transportation is proposing a diverging diamond interchange to replace roundabouts at the Interstate 17/Happy Valley Road interchange as a way to provide efficient and safe traffic flow for a growing area of north Phoenix.
A diverging diamond interchange has one major difference from standard diamond interchanges common around Arizona: Local street traffic makes a temporary shift to the left side while crossing the freeway, allowing for direct left turns onto entrance ramps without waiting at an additional traffic signal.
In examining options, ADOT determined that a diverging diamond interchange would be better able to manage the growing volume of traffic at Happy Valley Road and reduce the amount of time drivers spend waiting at traffic signals. It also enhances safety by reducing the number of points where directions of travel conflict.
More than 80 diverging diamond interchanges have been constructed in 29 states since 2009.
ADOT’s I-17 project also will include reconstructing the I-17 interchange at Pinnacle Peak Road, still as a traditional diamond interchange but with increased traffic capacity.
ADOT will host an informational meeting about the project the evening of Tuesday, July 25, with staff members available to answer questions:
What: ADOT meeting on I-17 interchanges project
When: Tuesday, July 25, from 6 p.m. to 7:30 p.m. (formal presentation at 6:30 p.m.)
Where: Goelet A. Beuf Community Center, 3435 W. Pinnacle Peak Road, Phoenix
Building a diverging diamond interchange at Happy Valley Road also will have less of an impact on local businesses and commuters, since traffic will continue to use the existing interchange while most of the construction work is taking place. The project will replace the two roundabout intersections that have been in use at the Happy Valley Road interchange since 2001.
ADOT continuously seeks innovative approaches to enhance safety and improve traffic flow, and the diverging diamond configuration is one of the tools available as interchanges are built or upgraded. Diverging diamond interchanges also will be built at two locations along the Loop 202 South Mountain Freeway: Desert Foothills Parkway and 17th Avenue.
The updated Regional Transportation Plan managed by the Maricopa Association of Governments, the regional transportation planning agency, provides funding for a project to reconstruct the I-17 interchanges at Happy Valley and Pinnacle Peak roads, scheduled to start as soon as fall 2018.
ADOT designs and constructs Phoenix-area freeway improvement projects based on the 20-year Regional Transportation Plan approved by Maricopa County voters in 2004.
PHOENIX – Hiking steep trails wearing full fire gear Wednesday and Thursday, and often with backpacks holding aerated buckets of fish and other gear, the rescue team salvaged fish from two populations of Gila trout from the ash-blanketed slopes of Mount Graham.
PHOENIX – The Arizona Department of Transportation Motor Vehicle Division has released the updated Arizona Driver License Manual on the ADOT website. In addition to providing basic information essential to safe driving, the newest version of the manual also includes language to educate motorists on handling law enforcement traffic stops.
FLAGSTAFF – The Coconino Amateur Radio Club met for their regular business meeting at the Sizzler in Flagstaff Thursday, July 13. In addition to the business, however, they had a prestigious award to present. In addition to the normal routine—such as winning the 2017 Field Day trophy—they made the presentation to the Arizona Amateur Radio Ham-of-the-Year.
WILLIAMS – The Old Smokey’s across from Dairy Queen on Route 66 was a Williams landmark for years. After serving hundreds of thousands of breakfasts and lunches to locals and travelers alike, the building became unusable. Several years ago, the new owners moved the restaurant downtown next to the mall at 125 W. Route 66.

